Free Test Plan Template (Excel, Word, PDF) With Example

test plan template

A free test plan template in Excel, Word, and PDF, with a filled website test plan example and a one-page Agile version.

Key takeaways
The 30-second version of this article
Download the test plan template free in Excel, Word, or PDF. Each file has a blank template and a filled website example, and the Excel file adds a one-page Agile version.
The template has 16 sections, from document control and scope to risks and approvals. Keep the ones your release needs.
Start from the filled example, write exit criteria you can check, and give every risk an owner.

A test plan template is a ready-made outline for the document that sets what a release will test, how, by whom, by when, and what counts as done. This one uses the sections test plans commonly include, from scope and approach to entry and exit criteria, risks, and sign-off, and comes with a filled example for a website release.

Download the test plan template

Format

Best for

Download

Excel (.xlsx)

Working on the plan as a team, tracking risks and milestones, and editing sections side by side. Also opens in Google Sheets

Excel template

Word (.docx)

A formal test plan document for review, sign-off, or audits

Word template

PDF

Printing or sharing a read-only copy

PDF template

Every file has the blank Template (all 16 sections, each with a short guidance line and space to write) and a Website example (the same plan filled in for an online store release). The Excel file adds a third sheet, One-page Agile: a blank one-page plan for a sprint or small release, followed by a filled sprint example.

In the Excel file, each part is its own sheet, and the Website example sheet uses the same layout as the Template sheet so you can compare them section by section. In the Word and PDF files, the blank template comes first and the filled example follows on a new page.

New to test plans? Read how to write a test plan first, then come back to fill this in.

What's in the test plan template

The sections run in this order. Keep the ones your release needs and delete the rest: a small web release rarely needs all 16.

#

Section

What goes in it

1

Document control

Project, release, document version, author, reviewers, and approval date

2

Introduction and objectives

What the release changes and what testing has to prove before it ships

3

Scope

Features in scope and features out of scope, with a reason for each exclusion

4

Test items

The builds, components, and services under test, with version numbers

5

Test approach

Test levels, test types, the manual vs automated split, and test design techniques

6

Entry criteria

What must be true before testing starts. See entry and exit criteria

7

Exit criteria

What must be true before you stop testing and recommend the release

8

Suspension and resumption criteria

When testing pauses (for example a blocker on the main flow) and what lets it restart

9

Test environment

Browsers, devices, operating systems, URLs, and the integrations or sandboxes you test against

10

Test data

The accounts, records, and payment or test values each area needs, and who prepares them

11

Roles and responsibilities

Who plans, tests, fixes, reviews, and signs off

12

Schedule and milestones

Dates for planning, each test cycle, regression and UAT, the go or no-go meeting, and release

13

Test deliverables

Test cases, run results, defect log, and the test summary report

14

Risks and mitigations

What could go wrong, how likely it is, its impact, the mitigation, and an owner

15

Tools

Test management, automation, defect tracking, and CI tools for this release

16

Approvals

A sign-off table: role, decision, signature, and date

The sections are based on the IEEE 829 test plan outline, now replaced by ISO/IEC/IEEE 29119-3, with entry and exit criteria, test data, and tools added and some sections merged. For the test cases themselves, use the test case template.

Website test plan template example: ecommerce release

This is what a filled test plan looks like: the key sections of the Website example sheet. It's an ecommerce website test plan for release 4.2 of an online store's web app, which replaces the three-step checkout with a single-page checkout and lets signed-in shoppers save a card for later orders. All names, dates, and URLs are illustrative.

Document control and objectives

Field

Example

Project

Online store web app

Release

4.2 (checkout redesign and saved cards)

Document version

1.1

Author

QA lead

Reviewers

Product manager, engineering lead, release manager

Approval date

2026-11-13

Objective 1

Confirm shoppers can complete a purchase with the new checkout on every supported browser and device

Objective 2

Confirm saved cards are added, shown, used, and removed correctly, and that the store never shows or keeps full card numbers

Objective 3

Confirm existing flows (cart, promo codes, guest checkout, order history) still work

Objective 4

Give the release manager a go or no-go recommendation backed by test results

Scope

Feature

In or out

Why

Single-page checkout: shipping address, delivery options, payment, order review

In

Rebuilt in this release

Save a card, choose a saved card, remove a saved card

In

New in this release

Guest checkout, promo codes and gift cards at checkout, order confirmation email

In

Changed or touched by the new checkout

Cart, sign-in, and order history

In (regression only)

Not changed, but they share code with checkout

iOS and Android apps

Out

Tested in their own release

Payment provider internals

Out

Covered by the provider's own certification

Warehouse and shipping systems after an order is placed

Out

Not changed in this release

Full load testing

Out

Planned for release 4.3

Test approach

Area

Example

Test levels

Unit and API tests (developers), integration, system, and user acceptance testing (product team)

Test types

Functional, regression, cross-browser, accessibility (WCAG 2.2 AA), security checks on saved cards, and a performance smoke test

Manual vs automated

Automated: regression suite for cart, sign-in, and checkout happy paths, run on every build in CI. Manual: exploratory testing of the new checkout, accessibility review, and UAT. New checkout happy paths are automated before code freeze

Techniques

Equivalence partitioning and boundary values for card and address fields, decision tables for promo code rules, state transition testing for saved cards (add, use, expire, remove), and 60-minute exploratory sessions per area

Entry and exit criteria

Criteria

Example

Entry

Release candidate deployed to staging and the smoke test passes; requirements and designs signed off; test cases reviewed and linked to requirements; test data and payment sandbox accounts ready; no open critical defects carried over from the previous build

Exit

All P1 and P2 test cases executed, and all P1 cases passed; no open critical or high defects, and medium defects have an agreed fix date or workaround; automated regression suite passes on the final release candidate; accessibility review finds no blocking issues; UAT signed off by the product manager; test summary report shared with the release manager

For how to write these, and the suspension and resumption rows that sit next to them, see entry and exit criteria in the test plan guide. The test summary report example checks this release against the same exit criteria.

Test environment

Item

Example

Browsers

Chrome, Firefox, Safari, and Edge (latest two versions)

Devices

Windows laptop, MacBook, iPhone and Android phone (mobile web), iPad (tablet web)

Operating systems

Windows 11, macOS, iOS, and Android (latest two versions)

URLs

Staging for system testing, a separate UAT environment for UAT

Integrations

Payment provider sandbox, test email inbox, tax calculation service (test mode), analytics test property

Risks and mitigations

Risk

Likelihood

Impact

Mitigation

Owner

Payment sandbox is slow or unavailable

Medium

High

Book sandbox time early and use mocked payment responses for non-payment tests

Engineering lead

Late design changes to the checkout page

Medium

Medium

Freeze designs on 2026-11-13 and route later changes through the QA lead

Product manager

Saved card data handled insecurely

Low

High

Security review of the saved cards service. Test that only tokens are stored and only the last 4 digits are shown

QA lead

Not enough mobile devices

Medium

Medium

Use a cloud device lab for less common devices

QA lead

Regression suite too slow for every build

Low

Medium

Run a smoke subset on every build and the full suite nightly

Test automation engineer

Schedule and milestones

Milestone

Start

End

Owner

Test planning and case design

2026-11-09

2026-11-13

QA lead

Test environment and data ready

2026-11-12

2026-11-16

Engineering lead

Test execution, cycle 1

2026-11-16

2026-11-20

QA engineers

Defect fixes and retest, cycle 2

2026-11-23

2026-11-27

QA engineers, developers

Regression and UAT

2026-11-30

2026-12-02

Product manager

Go or no-go meeting

2026-12-03

2026-12-03

Release manager

Release to production

2026-12-08

2026-12-08

Release manager

The Website example sheet also fills in test items, suspension and resumption criteria, test data, roles, deliverables, tools, and approvals.

One-page Agile test plan template

Not every release needs 16 sections. For a sprint or a small release, the One-page Agile sheet in the Excel file keeps the decisions that matter on a single page. It has a blank block to fill in, then this filled example for one sprint of the same online store:

Field

Example: online store, sprint 14 (saved cards)

Team and product

Checkout team, online store web app

Sprint or release

Sprint 14, 2026-11-16 to 2026-11-27

Sprint or release goal

Signed-in shoppers can save a card at checkout and pay with it on their next order

In scope

Save card option at the payment step; choose a saved card at checkout; remove a saved card from the account page; regression of guest checkout

Out of scope

Setting a default card (sprint 15); iOS and Android apps

Approach

Testers join refinement to agree acceptance criteria. API tests for the saved cards service run in CI. The save-and-pay happy path is added to the automated regression suite. One 60-minute exploratory session per story, plus an accessibility check of new form controls

Test environment

Staging, payment provider sandbox, Chrome, Safari, and mobile Safari

Risks and mitigations

Sandbox outages: use mocked payment responses for UI tests. Card data exposure: confirm only tokens are stored and only the last 4 digits are shown

Entry criteria

Story has acceptance criteria and designs; build deployed to staging and the smoke test passes; test accounts and sandbox cards ready

Exit criteria (definition of done for testing)

All acceptance criteria tested and passed; new happy path automated and passing in CI; no open critical or high defects on the sprint's stories; regression suite passes; results recorded in your test management tool and shown at the sprint review

Owner

QA engineer, checkout team

Dates

Plan agreed 2026-11-16. Reviewed at the sprint review on 2026-11-27

Use the one-page plan when the team is small, the release is short, and the plan will change every sprint. Use the full template when you need traceability, formal sign-off, or an audit trail, for example in regulated or contract work. The one-page version skips test items, deliverables, and the approvals table, so add those back if anyone outside the team has to sign off.

How to fill in the test plan template

  1. Start from the Website example, not the blank sheet. Copy it, then overwrite each row with your release. It's quicker to edit a filled section than to write one from nothing.
  2. Fill in scope before anything else. Agree what's in and out with the product owner first: the approach, environments, and schedule all depend on it.
  3. Write criteria you can check. "Testing is done" isn't a criterion. "No open critical or blocker defects" is. Tie each exit criterion to something the test report will show.
  4. Rate each risk and give it an owner. Likelihood and impact as low, medium, or high is enough. A risk with no owner rarely gets mitigated.
  5. Delete sections you don't need. An empty section tells reviewers nothing. If a section doesn't apply, remove it or write one line saying why.
  6. Review it with dev and product, then get sign-off. Update the plan when scope, dates, or risks change, and bump the document version each time.

For the reasoning behind each section, with types of test plans and a step-by-step method, see the test plan guide linked above. If your team doesn't have a test strategy yet, write that first: it sets the default approach and gates this plan applies to one release.

If your team runs tests in Katalon TestOps, the plan document stays in this template or your wiki. TestOps tracks the testing work for each release: releases and sprints synced from Jira or Azure DevOps, the requirements in each, and the test runs for each release. Its Requirement Coverage and Requirement Traceability reports show how much of the plan's scope has tests and results (both need requirements linked to test cases, and traceability needs the Jira or Azure DevOps connection).

Related templates: test strategy template, integration test plan template, bug report template, and test scenario examples.

Frequently asked questions

Huyen Nguyen
Huyen NguyenTechnical Writer, Katalon

Huyen Nguyen is an experienced technical writer in the software testing industry. With strong technical expertise and a deep understanding of Katalon products, she creates clear, practical guides that support testers at every skill level.

Connect on LinkedIn →
Get started

Test everything. Ship with confidence.

From generating test cases to spotting failures, Katalon's AI works across your entire pipeline, automatically.

Live webinar

The Next Evolution of Manual Testing: Introducing Katalon AI Test Runner

Learn how to grow your QA team's capacity in the age of AI, then watch Katalon AI Test Runner turn manual test cases into automated runs, live.

2:00 to 3:00 PM IST
Almas AhmedSenior Account Manager
Sumit WankhedeSolutions Engineer Manager
Register now